S/NO. | DESCRIPTION OF WORK SCOPE | DURATION OF EXECUTION | CLIENT | PROJECT LOCATION |
1 | DETAIL SURVEY OF S.P.D.C. RA GOLF COURSE | 12 DAYS | AANDERAAH NIG. LTD. FOR S.P.D.C. | PORT HARCOURT |
2 | POSITIONING SURVEY FOR PEARSON SURVEY OF 100KM PIPELINE | 60 DAYS | INTERSITE NIG. LTD. FOR AGIP | OGODA-BRASS |
3 | PRE-DREDGE SOUNDING SURVEY OF SPDC ORUBIRI FLOWSTATION ACCESS SLOT. | 10 DAYS | TERINO SURVEYS FOR SPDC | URUBIRI FIELD |
4 | PRE-DREDGE SOUNDING SURVEY OF SPDC ORUBIRI WELL 4 LOCATION ACCESS SLOT | 10 DAYS | TERINO SURVEYS FOR SPDC | URUBIRI FIELD |
5 | PRE-DREDGE SOUNDING SURVEY OF SPDC ALAKIRI WELL 25 LOCATION ACCESS SLOT | 12 DAYS | TERINO SURVEYS FOR SPDC | ALAKIRII FIELD |
6 | PRE & POST DREDGE SOUNDING SURVEY OF EKEREMOR SHORE PROTECTION | 14 DAYS | GEO LINK SERVICES FOR OMPADEC | EKEREMOR |
7 | PRE & POST DREDGE SOUNDING SURVEY OF AGBERE-ODONI SHORE PROTECTION | 12 DAYS | GEO LINK SERVICES FOR OMPADEC | AGBERE-ODONI |
8 | CONSTRUCTION OF 3/BEDROOM RESIDENTIAL BUNGALOW | 40 DAYS | ESSENTIAL GOODS AND SERVICES LTD | PORT HARCOURT |
9 | F/P SURVEY OF 40KM OGBIA OLOIBIRI ROAD | 52 DAYS | AANDERAAH NIG. LTD. | OGBIA–OLOIBIRI BAYESA STATE |
10 | SUPPLY OF THEODOLITES, EDM AND ACCESSORIES | 30 DAYS | NEW OIL FIELD AND ALLIED SERVICES LTD. NOAS | PORT HARCOURT |
11 | PIPELINE CORROSION SURVEY | 65 DAYS | NEW OIL FIELD AND ALLIED SERVICES LTD. NOAS | TEBIDABA BRASS |
12 | DETAIL SURVEY OF BISENI 1,45 AND ACCESS ROAD | 50 DAYS | AANDERAAH NIG. LTD | BISENI |
13 | ROOF REPAIR/RUG CLEANING AND INSTALLATION OF ¾ DELIVERY NOZZLE | 8 DAYS | MOBIL OIL NIG. PLC | PORT HARCOURT |
14 | LAYOUT SURVEY AND PROPERTY SURVEY | INDIVIDUALS | PORT HARCOURT | |
15 | DETAIL SURVEY OF I.A CABLE ROUTE | 45 DAYS | TOPTAY FOR SPDC | PORT HARCOURT |
16 | INTEGRITY SURVEY OF AKRI KWALE | 45 DAYS | NOAS FOR AGIP | PORT HARCOURT |
17 | INTEGRITY SURVEY OF OSHA OGODA | NOAS FOR AGIP | ||
18 | INTEGRITY SURVEY OF SHELL WEST PIPELINE | 40 DAYS | CENTURY FOR SPDC | WARRI |
19 | INTEGRITY SURVEY OF 24” & 25” BRASS MANI – BRASS TEM. P/LINE | 45 DAYS | NOAS FOR AGIP | BRASS |
20 | ROUTE SURVEY OF ODAGWA 1 & 11 ELECTRIFICATION PROJECT | 18 DAYS | DAIIK FOR SPDC | IMO RIVER FIELD |
21 | ROUTE SURVEY OF EDEGBERI ELECTRIFICATION PROJECT | 15 DAYS | VEETEK FOR SPDC | ADIBAWA FIELD |
22 | ROUTE SURVEY OF RUMUEKPE ELECTRIFICATION PROJECT | 20 DAYS | DAIIK FOR SPDC | RUMUEKPE FIELD |
23 | ROUTE SURVEY OF AKENFA ELECTRIFICATION PROJECT | 10 DAYS | VEETEK FOR SPDC | ETELEBOU FIELD |
24 | ELECTRIFICATION ROUTE SETTING OUT SURVEY FOR BUKUMA COMMUNITY | 14 DAYS | MORGREEN FOR SPDC | BUKUMA |
25 | ROUTE SURVEY OF AHIA ELECTRIFICATION PROJECT | 10 DAYS | VEETEK FOR SPDC | ETELEBOU FIELD |
26 | BILLE ELECTRIFICATION DESIGN PROJECT SURVEY | 15 DAYS | POINT ENGINEERING LIMITED | AWOBA FIELD |
27 | AS – BUILT SURVEY OF 10” SANTABABRA TO TORA MANIFOLD | 20 DAYS | DATA MAT LTD / DEC OIL & GAS LTD | SANTABABRA |
28 | AS – BUILT SURVEY OF SECTION OF ECTL ROW FROM BONNY TERMINAL TO KC MANIFOLD | 21 DAYS | DATA MAT LTD / DEC OIL & GAS LTD | BONNY |
29 | ROUTE VERIFICATION SURVEY FOR CCAGG PROJECT | 50 DAYS | DAEWOO FOR SHELL (POINT ENGINEERING) | CAWTHORNE CHANNEL |
30 | POSITIONAL / AS-BUILT SURVEY OF BORE HOLE POINTS | 15 DAYS | DAEWOO FOR SHELL (POINT ENGINEERING) | CAWTHORNE CHANNEL |
31 | DETAIL & TOPOGRAPHICAL SURVEY OF EGP-3 | 45 DAYS | DELTATEK FOR CHEVRON | ESCRAVOS |
32 | PIPELINE ROUTE SURVEY FOR STORM WATER DISCHARGE | 90 DAYS | INTEGRATED QUALITY TECH. LTD | NINTH MILE (ENUGU) |
33 | BATHYMETRIC SURVEY OF 10” DIEBUCREEK CROSSING AND 14” RUMUEKPE TL RIVER CROSSING | 10 DAYS | POINT ENG. /SPDC | RUMUEKPE |
34 | PIPELINE SURVEY OF IBEWA-OBAGR GAS LINE | 8MTHS. | WECO ENG./TOTALFINAELF | OBAGI |
35 | PEROMETER / TOPOGRAPHICAL SURVEY OF UAC PROPERTIES | 15 DAYS | UAC | PORT HARCOURT |
36 | PRODUCTION OF AS-BUILT SURVEY OF FEDERAL GOVT. LANDED PROPERTIES IN LAGOS | 20 DAYS | PRESIDENCY | IKOYI LAGOS |
37 | HYDROGAPHIC SURVEY OF SUBMARINE CALBE ROUTE AT KAA & KPEAN | 10 DAYS | ROCKSONS ENG. | GOKANA (RIVERS) |
38 | SOIL INVESTIGATION WORK FOR AFAM VI POWER STATE | 30 DAYS | DAEWOO | AFAM (RIVERS) |
39 | PERIMETER SURVEY OF 60.0 HECTARES AT SAPELE | 14 DAYS | ROCKSON | SAPELE |
40 | COMPREHENSIVE SURVEY OF 100, PLOT OF LAND AT ELEME | 21 DAYS | OWEL HOLDINGS LTD. | ELEME (RIVERS) |